xxx Electronic Group

solution_banner

xxx Electronic Group

This is an intelligent storage project involves the whole manufacturing process of flexible multilayer PCB, AGV transfer, robotic stacking system, whole site WMS system and equipment scheduling system. The solution of the overall system includes mini load stereoscopic warehouse, AGV transfer system, robotic palletizing system, conveyor system and multishuttle intensive storage system.

  • Project Parameters

    Construction area: 20000㎡
    Pallet positions: 25000 units
    Warehousing efficiency: 360 boxes/hour
    Equipment and quantity: 3 sets of 4 directions multishuttle, 3 sets of AGV, 2 sets of mini load stacker

    Project Parameters
  • Project Highlights

    1) The whole system covers all processes of intelligent manufacturing, which construct a PCB intelligent manufacturing model factory.
    2) Deep combination of WMS and MES to control the whole business process data from raw materials to finished products.
    3) Intelligent warehouse as a core system, supplemented with AGV and conveying system to achieve the upgrade and iteration from equipment automation to the whole factory intellectualization.